Wastewater Treatment Facility (WWTF) Upgrade Project (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-8041-110

4 Documents in Project

Summary

SCH Number
2015012033
Lead Agency
City of Shasta Lake
Document Title
Wastewater Treatment Facility (WWTF) Upgrade Project (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-8041-110
Document Type
NOD - Notice of Determination
Received
Posted
4/3/2017
Present Land Use
Public Facilities Land Use Designation and Zoning District
Document Description
The purpose of the project is to improve the quality of the effluent from the City's WWTF so that it can be discharged year-round directly into Churn Creek without dilution, consistent with the NPDES Permit requirements. The Project consists of various upgrades to enable the WWTF to meet stricter limitations requirements for ammonia, copper, dichlorobromethane, nitrate, pH, and zinc. The project includes installation of a new effluent discharge pipeline, cascade re-aeration structure, and replacement of the primary discharge point into Churn Creek (Outfall 001). The pre-project maximum daily flow rate for outfall 001, which discharges only in the winter months, is 6.22 cubic feet per second. Post-project, discharge would occur form outfall 001, and the maximum flow rate would be 12.18 cfs. The secondary discharge point into Churn Creek (outfall 002) would be abandoned in place. The pre-project maximum daily flow rate for discharge point 002 is 10.32 cfs, and there would be no post-project discharge. In addition, the spray fields and 400-acre foot reclaimed water reservoir would be taken off line and abandoned in place. With the exception of the effluent pipeline and outfall structure in the riparian area of Churn Creek, all proposed improvements would take place within the existing development footprint of the WWTF.

Contact Information

Name
Carina Grove
Agency Name
SWRCB
Contact Types
Lead/Public Agency

Location

Cities
Shasta Lake
Counties
Shasta
Cross Streets
Pine Grove Avenue and Tibbitts
Zip
96019
Total Acres
106
Parcel #
064-150-070, 064-160-005 & 007
State Highways
Hwy 5
Railways
UPRR
Schools
Central Valley HS
Waterways
Churn Creek
Township
32N
Range
5W
Section
1

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print