Response Plan for Amanda Estate Development Project

3 Documents in Project

Summary

SCH Number
2014121084
Lead Agency
City of Escondido
Document Title
Response Plan for Amanda Estate Development Project
Document Type
NOD - Notice of Determination
Received
Posted
9/4/2015
Present Land Use
various
Document Description
The project is implementation of a RAW for excavation and offsite disposal of the impacted soil at the Amanda Estate Development Project (Site). - Excavate approximately 132 cy of impacted "in-situ" soil from a single identified location. - if necessary, segregate and stockpile impacted soils that contain the COCs at concentrations greater than the site specific CGs - Conduct confirmation soil sampling, compare confirmation data to the CGs, and excavate additional volume until the CGs are met. - Load and transport approximately 132 CY of impacted "in-situ" soil to an appropriate disposal facility; and (approximately 165 loose fluff cy). Obtaining the import fill material will be in accordance with the current local governmental agency and DTSC guidance on import fill material. - Depending on soil types, the soil volume may be increased 10% - 25% after digging. - DTSC is the responsible agency requiring a response action for the impacted soil. The city of Escondido is the lead agency for the Amanda Estate Development project. oject.

Contact Information

Name
Poonam Acharya
Agency Name
DTSC
Contact Types
Lead/Public Agency

Location

Cities
Escondido
Counties
San Diego
Cross Streets
Gamble Lane/Citracado Parkway
Zip
92029
Total Acres
11.2
Parcel #
Various
State Highways
I-15
Schools
Various
Waterways
Escondido Creek
Township
12S
Range
2W
Section
28

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print