New Middle School and High School (a.k.a. Proposed Education Complex) Removal Action Workplan
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2014121038
- Lead Agency
- Sanger Unified School District
- Document Title
- New Middle School and High School (a.k.a. Proposed Education Complex) Removal Action Workplan
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 1/18/2017
- Present Land Use
- LU: Z: GP: vacant, fallow ag, and rural res: A1-20 (Limited Ag): Ag
- Document Description
- The project consists of approval by the DTSC of Removal Action Workplan submitted by BSK Associates Engineers & Laboratories on behalf of the Sanger Unified School District on Oct. 24, 2016. The purpose of the RAW is to mitigate potential risk to human health and the environment by the Contaminants of Concern (COC) in soils at three parcels (5, 8, and 9) located within a 116 acre Site that the Sanger Unified School District is planning to develop as a middle and high school education complex. The COCs are lead, dichlorodiphenyldichloroethylene (DDE), dichloro-dephynyl-trichlorethane (DDT), and dieldrin. The recommended removal action remedy, as deemed preferable by DTSC, combines excavation with offsite disposal of the impacted soil. The activities that would be conducted to implement this removal action are described below: Excavate approx. 320 bank cubic yards (CY) of impacted soil form identified location as follows - Parcel 5: Total of 250 CY at the barn, irrigation well, residence, and garage - Parcel 8: Total of 25 CY at the former structure - Parcel 9: total of 45 CY at the irrigation well If necessary, segregate and stockpile impacted soils that contain the COCs at the concentrations greater than the site-specific cleanup goals (CGs). Conduct confirmation soil sampling, compare confirmation data to the CGs, and excavate additional volume until CGs are met. Load and transport approx. 320 bank "in-situ" CY or 400 loose "fluff" CY of impacted soil to an appropriate disposal facility. If necessary, grade, backfill and compact previously excavated areas using clean import fill material (approx. 400 loos CY). Obtaining the import fill material will be in accordance with the current DTSC guidance on import fill material.
- Contact Information
-
Mellan Songco
DTSC
8800 Cal Center Drive
Sacramento, CA 95826
Phone : (916) 255-6527
Location
- Coordinates
- 36°42'37"N 119°40'43"W
- Cities
- Fresno
- Counties
- Fresno
- Cross Streets
- Jensen Avenue at Fowler Avenue
- Zip
- 93706
- Total Acres
- 120
- State Highways
- Hwy 180
- Railways
- UPRR, BNSF
- Airports
- No
- Schools
- 5 ES
- Waterways
- Fresno Canal, Briggs Canal
- Township
- 14S
- Range
- 21E
- Section
- 15
- Base
- MDB&M
Notice of Determination
- Approving Agency
- DTSC
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 8800 Cal Center Dr., Sacramento, CA 95826
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- N/A
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.