Event Center and Mixed-Use Development at Mission Bay Blocks 29-32
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2014112045
- Lead Agency
- San Francisco, City and County of (City and County of San Francisco)
- Document Title
- Event Center and Mixed-Use Development at Mission Bay Blocks 29-32
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/14/2020
- Project Applicant
- GSW Hotel LLC
- Present Land Use
- Mixed-Use Development
- Document Description
- GSW Hotel LLC proposed, and the Commission, the San Francisco Planning Commission ("Planning Commission"), and the Board of Supervisors have approved changes (the "2020 Modifications") to the Project approved in 2015. The 2020 Modifications allow development of a mixed-use building with hotel, residential and retail uses on the northern portion of Blocks 29 and 30, and increase the limit on leasable square feet of retail on Blocks 29-32. The 2020 Modifications were implemented through amendments to the Redevelopment Plan for the Mission Bay South Redevelopment Project (the "Redevelopment Plan"), the Mission Bay South Owner Participation Agreement ("OPA"),the D4D, the Major Phase and the BC/SD, each approved by the Commission, and with respect to the Redevelopment Plan amendment, also approved by the Planning Commission and Board of Supervisors. The Redevelopment Plan amendment allows a mixture of hotel and residential uses on Blocks 29-30, increases the number of hotels and hotel rooms in the Redevelopment Plan Area, allocates certain dwelling units to Blocks 29-30, and increases the limitation on total retail leasable square feet in the Redevelopment Plan Area and on Blocks 29-32. The OPA amendment allows a mixture of hotel and residential uses on Blocks 29-30, increases the limitation on total retail leasable square feet on Blocks 29-32, provides for the payment of certain fees in connection with the project contemplated by the 2020 Modifications, allocates certain dwelling units to Blocks 29-30, and requires the project contemplated by the 2020 Modifications to comply with certain requirements related to small business hiring. The D4D amendment increases the maximum allowed building height and plan length, adds one tower on Blocks 29-30 and a corresponding increase in tower developable area within Height Zone 5, decreases the minimum allowed tower separation distance between the tower on Blocks 29-30 and the event center on Blocks 29-32, adds an exception to allow a rooftop recreation structure with certain height and area provisions, and allows a minor increase in the allowed maximum building projection at the ground-floor entry canopy location only. The amendments to the Major Phase and BC/SD permit development of a mixed-use building on Blocks 29-30 with up to 129 hotel rooms, up to 21 residential units, and various retail spaces.
- Contact Information
-
Jose Campos jose.campos@sfgov.org
Successor Agency to the Redevelopment Agency of the City and Cou
One South Van Ness, Fifth Floor
San Francisco, CA 94103
Phone : (628) 652-7490
jose.campos@sfgov.org
Location
- Cities
- San Francisco
- Counties
- San Francisco
- Regions
- San Francisco Bay Area
- Cross Streets
- Third Street, Terry Francois Boulevard, Warriors Way, and 16th Street
- Zip
- 94103
- Total Acres
- 11
- State Highways
- 101, I-80, I-280
- Waterways
- San Francisco Bay
- Township
- N/A
Notice of Determination
- Approving Agency
- Successor Agency to the Redevelopment Agency of the City and Cou
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- San Francisco Planning Department
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Environmental Document
- NOD filed- GSW Hotel - Mission Bay Blocks 29-32 PDF 2967 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.