Harkins Bridge Replacement Project

3 Documents in Project

Summary

SCH Number
2014102044
Lead Agency
Midpeninsula Regional Open Space District
Document Title
Harkins Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
3/12/2015
Present Land Use
Timberland Preserve-Coastal Zone District (TPZ-CZ)
Document Description
The Project involves the removal and replacement of a deteriorated railroad car bridge crossing over Purisima Creek, which would entail demolition of an existing access road to the old bridge location, site restoration of the area of the old bridge location; construction of a temporary culvert crossing with associated water diversion plan; installation of a new bridge, construction of a new access roadway and trail to the proposed bridge, and temporary fencing along Purisima Creek Trail to exclude the public from construction activities. The project goals and objectives are as follows: -Remove the existing deteriorated bridge over Purisima Creek and restore the bridge approaches and bridge area to reduce soil erosion. -Construct a new bridge and associated new access roadway approximately 100 feet upstream of the existing bridge that will improve public safety for the District with safe vehicular access for patrol, fire and other emergency vehicles.

Contact Information

Name
Aaron Hebert
Agency Name
Midpeninsula Regional Open Space District
Contact Types
Lead/Public Agency

Location

Cities
Half Moon Bay
Counties
San Mateo
Cross Streets
Higgins Canyon Road and Purisima Creek Road
Zip
94019
Total Acres
.08
Parcel #
067-320-220
State Highways
Hwy 1
Waterways
Purisima Creek
Township
6S
Range
5W
Section
1

Notice of Determination

Approving Agency
Midpeninsula Regional Open Space District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.