Bandicoot Basin Project (Lake or Streambed Alteration Agreement No. 1600-2016-0121-R6)

2 Documents in Project

Summary

SCH Number
2014101051
Lead Agency
San Bernardino Flood Control District
Document Title
Bandicoot Basin Project (Lake or Streambed Alteration Agreement No. 1600-2016-0121-R6)
Document Type
NOD - Notice of Determination
Received
Posted
3/17/2017
Present Land Use
Oak Hill Community Plan-Single Residential, Rural Living, and Neighborhood Commercial
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0121-R6, pursuant to section 1602 of the Fish and Game Code to the project Applicant, San Bernardino County Flood Control. The proposed project includes the construction and operation of one storm water detention basin: the Bandicoot Basin as well as additional work along Bandicoot Trail in association with the proposed Bandicoot Basin. The basin will be designed in accordance with the San Bernardino County's Detention Basin Criteria. The County's Detention Basin Criteria require detention basins to have an emergency spillway to pass the fully developed 1,000-year peak flow, or that peak flow rate required by the CA Division of Safety of Dams (DSOD), whichever is greater. The design of the proposed detention basin will incorporate emergency spillways to prevent overtopping of the basin embankments. Additionally, the basin will fall within the jurisdiction of DSOD based on the proposed embankment heights (25 feet) and the anticipated detention volumes. The proposed project would also include construction of associated inlet and outlet structures, channels and/or closed conduits, transition structures, headwalls, wingwalls, basin embankments, access roads along tops of the embankments and around the basins, and access ramps to the basin floor. The maximum construction impact area is estimated to be 61 acres for Bandicoot Basin.

Contact Information

Name
Heather Weiche
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Hesperia
Counties
San Bernardino
Cross Streets
Bandicoot: Bandicoot Trail/Palm Street, Oak Hills: Escondido Avenue/Ranchero Road
Zip
92345
Total Acres
120
Parcel #
Multiple
State Highways
I-15
Airports
Hesperia
Schools
Cedar and Oak Hills
Waterways
California Aqueduct
Township
14N
Range
5W
Section
Multip
Base
SBB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.