Interim NSA Pipeline Project

3 Documents in Project

Summary

SCH Number
2014082083
Lead Agency
Sacramento County
Document Title
Interim NSA Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
12/15/2014
Present Land Use
The project is located within the County Rd. ROW. Surrounding land is designated general Agriculture zoned AG 40
Document Description
The proposed Interim NSA Project is Phase 1 of the North Service Area Pipeline, Tank and Booster Pump Project (NSA Project; control number PWEP2007-70373). The full NSA Project is a Sacramento County Water Agency (SCWA) project designed to expand the potable water supply system to serve the North Service Area. The NSA includes the Mather Field Specific Plan and the Sunrise Douglas Community Plan Areas. The project consists of the installation of underground water pipes to convey treated water from the Vineyard Surface Water Treatment Plant (VSWTP) to the Anatolia Groundwater Treatment Plant (AWTP). Phase 1 of the NSA project will install pipeline along Florin Road and Excelsior Road to supply 9,000 gpm of water from the VSWTP and Excelsior well field to the AWTP.

Contact Information

Name
Catherine Hack
Agency Name
Sacramento County
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Cross Streets
Florin Road and Excelsior Road
Zip
95816
Total Acres
4
Township
8N
Range
6E
Section
34
Other Location Info
Vinyard

Notice of Determination

Approving Agency
County of Sacramento Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print