Sunset/Huntington Harbour Maintenance Dredging and Waterline Installation Project

3 Documents in Project

Summary

SCH Number
2014081072
Lead Agency
Orange County
Document Title
Sunset/Huntington Harbour Maintenance Dredging and Waterline Installation Project
Document Type
NOD - Notice of Determination
Received
Posted
4/24/2015
Present Land Use
5 "Open Space" (OS-W) and Residential Low Density (RL-7) Districts
Document Description
The County of Orange (County) and the City of Huntington Beach (City) are responsible for the proposed Maintenance Dredging and Waterline Installation project components. The installation of a 14-inch-diameter waterline pipe within the Harbor (both in-water and landside) would be the responsibility of the City. The proposed landside activities associated with the Waterline Installation component of the project would involve connecting the waterline pipe to existing utility infrastructure and construction staging activities on either side of the Harbor channel. The State Lands Commission action is an approval of a 25-year General Lease - Public Agency Use from April 23, 2015, through April 22, 2040.

Contact Information

Name
Jennifer Lucchesi
Agency Name
California State Lands Commission
Contact Types
Lead/Public Agency

Location

Cities
Huntington Beach, Seal Beach
Counties
Orange
Cross Streets
Edinger Avenue & Sunset Way
Zip
92649
Total Acres
2.1
State Highways
SR 1
Railways
Pacific Coast
Schools
Harbour View E School
Waterways
Sunset & Huntington Harbour
Township
5S
Range
11W
Section
30
Base
SBB&M

Notice of Determination

Approving Agency
California State Lands Commission
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.