Red Bluff Riverfront Park Boat Ramp – Phase 2 (California Endangered Species Act Incidental Take Permit No. 2081-2019-058-01 (ITP))

7 Documents in Project

Summary

SCH Number
2014072008
Lead Agency
City of Red Bluff
Document Title
Red Bluff Riverfront Park Boat Ramp – Phase 2 (California Endangered Species Act Incidental Take Permit No. 2081-2019-058-01 (ITP))
Document Type
NOD - Notice of Determination
Received
Posted
5/7/2020
Document Description
This proposed Project involves the construction of a two-lane boat ramp designed for motorized boats on the edge of the Sacramento River. The purpose of the Project is to provide permanent boating access to the Sacramento River, separate from an existing boat ramp that will remain in place for canoes, kayaks, and other non-motorized recreational watercraft. The new boat ramp will be a two-lane “V”-groove reinforced concrete ramp approximately 112.5 feet long with a 14 percent slope, and two 15-foot wide lanes with an 8-foot wide boarding float with solar lighting and/or a walkway to accommodate vessel boarding. The Project also involves the construction of an access road, maneuver area, ADA parking slab, ADA walkways, and rock slope protection. See NOD for full document description.

Contact Information

Name
Kristin Hubbard
Agency Name
California Department of Fish and Wildlife Northern Region
Contact Types
Lead/Public Agency

Location

Cities
Red Bluff
Counties
Tehama
Township
27N
Range
3W
Section
20
Other Location Info
The Project is located on the Sacramento River within the Riverfront Park in the City of Red Bluff, Tehama County.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.