GWF Outfall Removal Project

2 Documents in Project

Summary

SCH Number
2014062059
Lead Agency
California State Lands Commission
Document Title
GWF Outfall Removal Project
Document Type
NOD - Notice of Determination
Received

Document Description
GWF Power Systems L.P. (GWF) proposes to remove its outfall structure; which has been out of use since 2012, from sovereign land in Suisun Bay and terminate its lease with the State Lands Commission. The outfall consists of an approximately 275-foot-long, 6-inch-diameter high density polyethylene pipe with fifteen 3-inch-diameter diffuser risers spaced at 30-inch intervals. In addition, two wood piles marking the outfall's location on the shoreline would be removed to at least 24 inches below the mudline. Removal activities would be carried out from a barge offshore. The pipe would be "peeled" out of the sediment in sections, using a chain, loaded onto the barge, and then sent to an appropriate facility for recycling or disposal. The State Lands Commission action is an amendment of a 30-year General Lease - Right-of-Way Use through August 1, 2018, to allow the removal of the outfall from the lease premises, acceptance of a lease quitclaim by the Commission, and subsequent termination of the lease.

Contact Information
Jennifer Lucchesi
California State Lands Commission
100 Howe Avenue, Suite 100-South
Sacramento, CA 95825-8202

916-574-1800
916-574-1810

Location

Coordinates
38°03'8.7"N 121°59'15.3"W
Counties
Contra Costa
Cross Streets
North of Nichols Road
Zip
94565
Total Acres
4
Parcel #
099-030-015
Railways
Burlington Northern
Schools
Shore Acres ES
Waterways
Suisun Bay
Township
2N
Range
1W
Section
4
Other Location Info
Bay Point

Notice of Determination

Approving Agency
California State Lands Commission
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
California State Lands Commission, 100 Howe Avenue, Suite 100-South, Sacramento, CA 95825-8202

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No