Plainview Wastewater System - Feasibility Study

2 Documents in Project

Summary

SCH Number
2014041078
Lead Agency
Tulare County
Document Title
Plainview Wastewater System - Feasibility Study
Document Type
EIR - Draft EIR
Received
Present Land Use
Various
Document Description
The project would result in construction of a wastewater main along Road 196 (and lift stations) which will connect to an existing city wastewater trunk line; (approximately five miles north of Plainview) and construction of a sewer collection system through lateral collection lines in various county rights of ways abutting each home or business within Plainview. The wastewater main line would be constructed within the Road 196 right of way extending from Plainview to the city sewer trunk pipeline (at the intersection of SR 65 and Road 196). Depending on precise engineering designs, between one and five lift stations or other appurtenant structures may also be required. Pipelines would be installed via open-cut trenching; trenches would be closed upon completion of construction. Roadways would be repaved/resurfaced as needed and specified by the county of Tulare.

Contact Information

Name
Hector Guerra
Agency Name
Tulare County
Contact Types
Lead/Public Agency

Location

Cities
Visalia
Counties
Tulare
Township
20S
Range
26E
Section
35
Base
MDB&M
Other Location Info
Plainview

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 6 (DOT), California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), Central Valley Flood Protection Board, Department of Water Resources, Resources Agency, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Drinking Water, District 24, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Other (Sewer collection system and main line inter-tie)
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print