Pier 1 North Dry Dock, Associated Real Estate Agreements & Removal of Cooling Tunnels Project
5 Documents in Project
Summary
SCH Number
2014041071
Lead Agency
San Diego Unified Port District
Document Title
Pier 1 North Dry Dock, Associated Real Estate Agreements & Removal of Cooling Tunnels Project
Document Type
NOD - Notice of Determination
Received
Posted
4/20/2016
Present Land Use
Port Master Plan designated land portion as Marine Related Industrial and Specialized Berthing over the water portion.
Document Description
The San Diego Regional Water Quality Control Board is issuing a Clean Water Act Section 401 water quality certification (Cert. No. R9-2015-0080) to the project applicant. The applicant proposes to 395,000 cubic yards of dredging, pile driving, installation/retrofit of two mooring dolphis and wharf structures, a permanent sheetpile wall, and associated infrastructure and utilities. Disposal of dredged material includes upland disposal, ocean disposal, and in-bay reuse to fill in a portion of the former South Bay Power Plant cooling water intake channel for the purposes of creating eelgrass habitat to mitigate for project impacts.
Contact Information
Name
Lisa Honma
Agency Name
RWQCB
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Diego
Cross Streets
Belt Street / Sampson Street (2205 and 400 E. Belt Street)
Zip
92113
Total Acres
11.5
Parcel #
021-015-00 and 021-028-00
State Highways
I-5
Railways
AT&SF
Waterways
San Diego Bay
Other Location Info
Barrio Logan
Notice of Determination
Approving Agency
RWQCB - San Diego Reigon
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.