Pier 1 North Drydock, Future Real Estate Agreements & Removal of Cooling Tunnels
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2014041071
- Lead Agency
- San Diego Unified Port District
- Document Title
- Pier 1 North Drydock, Future Real Estate Agreements & Removal of Cooling Tunnels
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/18/2015
- Present Land Use
- Port Master Plan designated land portion as Marine Related Industrial and Specialized Berthing over the water portion.
- Document Description
- The project is a new drydock on the north side of BAE's existing Pier 1, an extension of its lease term based on investments on the leasehold and a future real estate agreement with the District on the neighboring two acre land parcel and four acre water area for parking, storage, and pier side activities associated with ship repair. The existing intake/discharge tunnels on the two acre property would also be removed. The drydock involves 395,000 cubic yards of dredging; pile driving; installation/retrofit of two mooring dolphins and wharf structures; a permanent sheet pile wall and associated infrastructure and utilities.
- Contact Information
-
Larry Hofreiter
San Diego Unified Port District
Lead/Public Agency
3165 Pacific Highway
San Diego, CA 92101
Phone : (619) 686-6257
Location
- Coordinates
- 32°7'"N 117°'"W
- Counties
- San Diego
- Cross Streets
- Belt Street / Sampson Street (2205 and 400 E. Belt Street)
- Zip
- 92113
- Total Acres
- 11.5
- Parcel #
- 021-015-00 and 021-028-00
- State Highways
- I-5
- Railways
- AT&SF
- Waterways
- San Diego Bay
- Other Location Info
- Barrio Logan
Notice of Determination
- Approving Agency
- San Diego Unified Port District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 3165 Pacific Highway, San Diego, CA 92101
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.