Wavecrest Coastal Trail

2 Documents in Project

Summary

SCH Number
2014032063
Lead Agency
City of Half Moon Bay
Document Title
Wavecrest Coastal Trail
Document Type
NOD - Notice of Determination
Received
Posted
6/2/2014
Present Land Use
Planned Development District / PUD
Document Description
The Project includes a 1,698 linear-foot segment of the CA Coastal Trail and 342 linear feet of spur trails to coastal overlooks and through a Monterey cypress grove. The proposed trail would provide formal public access through the Project Area, directing users to a safe route that respects coastal resources. The proposed trail segment alignment respects coastal resources by directing foot and bicycle traffic away from wetlands and other sensitive areas, reducing multiple informal footpaths, and reducing erosion caused by informal recreation. Other Project components consist of vegetation consist of vegetation enhancement, wetland protection, and incorporation of construction measures to minimize wildlife and soil disturbance through construction methods and timing.

Contact Information

Name
Janet Diehl
Agency Name
CA State Coastal Conservancy
Contact Types
Lead/Public Agency

Location

Cities
Half Moon Bay
Counties
San Mateo
Cross Streets
Seymour Street and Cabrillo Hwy 1
Zip
94019
Total Acres
50
Parcel #
065-011-150
State Highways
Hwy 1, 92
Schools
Sea Crest School
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
Calfiornia State Coastal Conservancy
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print