Alliance California Gateway South Building 3

3 Documents in Project

Summary

SCH Number
2013101021
Lead Agency
City of San Bernardino
Document Title
Alliance California Gateway South Building 3
Document Type
NOD - Notice of Determination
Received
Posted
2/25/2014
Present Land Use
Industrial Light
Document Description
The project consists of a Tentative Parcel Map (TPM 19487) (SUB13-07) and a Development Permit/Site Plan (DP-P13-09). TPM 19487 subdivides the 62.85-acre property into two (2) parcels and identifies the size and location water, sewer, drainage, and utility infrastructure improvements to serve the project. Parcel 1 of TPM 19487 comprises 13.20 acres, and will not be developed or physically disturbed by the project. Parel 1 of TPM 19487 comprises 13.20 acres, and will not be developed or physically distrubed by the project. Parcel 2 of TPM 19487 comprises 49.65 acres, and will nbe developed as an industrial warehouse project. Parcel 2 of TPM 19487.

Contact Information

Name
John Schaefer
Agency Name
Hillwood Investment Properties
Contact Types
Lead/Public Agency

Location

Cities
San Bernardino
Counties
San Bernardino
Cross Streets
East Orange Show Road and South Waterman Avenue
Zip
92408
Total Acres
62.85
State Highways
I-215 and 10
Railways
AT&SF
Airports
San Bernardino Int'l
Schools
Norton Space Academy
Waterways
Santa Ana River
Township
1S
Range
4W
Section
23/14
Base
SBB&M

Notice of Determination

Approving Agency
City of San Bernardino
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print