Storm Drain Master Plan 2012 Update

2 Documents in Project

Summary

SCH Number
2013092017
Lead Agency
City of Milpitas
Document Title
Storm Drain Master Plan 2012 Update
Document Type
NOD - Notice of Determination
Received
Posted
11/19/2013
Present Land Use
City roadway rights-of-way and utility easements, and adjacent to existing waterways and Parks and Open Space (POS) areas.
Document Description
The proposed project is the implementation of the Milpitas Storm Drain Master Plan (SDMP), which identifies the capital improvements needed to maintain recommended levels of protection against stormwater runoff, and the need for a revenue stream that would allow the necessary capital improvements to keep the storm drain system in working order for the adjacent land uses into the future. The SDMP is based on ultimate build-out within the City's boundaries according to the General Plan's Land Use Map (October 2012). The Milpitas SDMP is divided into different types of improvement projects throughout the City's storm drainage system. To increase the pipeline storm drain system capacity, there are two types of proposed projects: installing new relief sewer pipelines parallel to existing pipelines; and replacing overloaded pipelines with larger diameter pipes in the same locations. Each of the City's storm drainage collection systems discharges into one of Coyote Creek's tributaries, by either gravity or pumping. The proposed project would include the replacement of existing outfalls, installation of new outfalls, or new outfalls where none exists.

Contact Information

Name
Jeffery Leung
Agency Name
City of Milpitas
Contact Types
Lead/Public Agency

Location

Cities
Milpitas
Counties
Santa Clara
Cross Streets
Highway 237, I-680, I-880
Zip
95035
Total Acres
8723
State Highways
Hwy 237
Railways
BART, Caltrain, UPRR
Schools
MUSD, Berryessa Union
Waterways
Coyote Creek, Piedmont, Los Coches, Penitencia

Notice of Determination

Approving Agency
City of Milipitas
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print