Truckee R. Br and Donner Lake UC Bridge Scour Treatment
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2013082069
- Lead Agency
- California Department of Transportation, District 3
- Document Title
- Truckee R. Br and Donner Lake UC Bridge Scour Treatment
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/18/2013
- Present Land Use
- open space and forestry
- Document Description
- This project is located in Nevada County on I-80 at post mile 9.13 and 28.0-28.1. The purpose of the project is to rehabilitate the supporting structures of the bridge by repairing bent caps, replacing seismic sher blocks, and replacing seismic restrainer cables on both the Truckee River Bridge (#17-0063 R/L) and the Donner Lake UC (#17-0076). This project is needed because the spalled and fractured areas of the bridge bents require ongoing maintenance and repairs in order to maintain the structural integrity of the bridge.
- Contact Information
-
Suzanne Melim
California Department of Transportation, District 3
Lead/Public Agency
703 B Street
Marysville, CA 95901
Phone : (530) 741-4484
Location
- Cities
- Marysville
- Counties
- Yuba
- Cross Streets
- Floriston
- Zip
- 96161
- State Highways
- Hwy 80
- Railways
- UPRR
- Waterways
- Truckee River
Notice of Determination
- Approving Agency
- California Department of Transportation
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Caltrans, 703 B St, Marysville CA 95901
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.