CRC Elk Hills 03054264

540 Documents in Project

Summary

SCH Number
2013081079
Lead Agency
Kern County
Document Title
CRC Elk Hills 03054264
Document Type
NOD - Notice of Determination
Received

Document Description
The originally approved project consists of an amendment to Title 19 Kern County Zoning Ordinance (July 2012), with focus on Chapter 19.98 (Oil and Gas Production), to include new site development standards for all oil and gas exploration, extraction, operations, and production activities in unincorporated Kern County. CA Resources of Elk Hills, LLC proposes to hydraulically fracture one existing well (API# 03054264), which is located in a densely developed oilfield and was directionally drilled in 2014. The hydraulic fracture would occur in two stages (two fracturing events). Recovered fluids, including wastewater and produced water after fracturing activity, will be collected in a closed system and portable tanks at the well site, and disposed of via injection wells that have already been permitted. The estimated water volume to be used is 4,000 barrels and the water would be purchased from the West Kern Water District. DOGGR will permit the well stimulation treatment activity of this project, and is therefore, a CEQA Responsible Agency.

Contact Information
Amanda Brashear
Department of Conservation, Division of Oil, Gas & Geothermal Re
801 K Street, MS 18-05
Sacramento, CA 95814

916-319-8261

Location

Counties
Kern
Zip
93560
Total Acres
3110 sq mi
Parcel #
Multiple
State Highways
Hwy 99, 58, 43, 46, 119, 223, 20
Railways
Multiple
Airports
Multiple
Schools
Multiple
Waterways
Kern River
Other Location Info
Multiple

Notice of Determination

Approving Agency
Division of Oil, Gas, and Geothermal Resources
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
http://pcd.kernsdsa.com/oil-gas-zoning-amendment

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search