Breitburn 052-0001

631 Documents in Project

Summary

SCH Number
2013081079
Lead Agency
Kern County
Document Title
Breitburn 052-0001
Document Type
NOD - Notice of Determination
Received

Document Description
The originally approved project consists of an amendment to Title 19 Kern County Zoning Ordinance (July 2012), with focus on Ch. 19.98 (Oil and Gas Production), to include new site development standards for all oil and gas exploration, extraction, operations, and production activities in unincorporated Kern County. The DOGGR, as the CEQA responsible agency, will be issuing a permit for the proposed project activity, which consists of the following: The purpose is to perform WSTs (re-frac) on the four (4) above mentioned existing wells in North and South Belridge for the purpose of increasing oil production. Each WST is expected to take about four days. Fluids from the WST will be collected in a closed system and will be discharged onto the ground or into sumps. All flowback water is processed and re-injected into the water flood using the same procedures used to manage produced water from the field's oil production.

Contact Information
Meri Meraz
Dept. of Conservation, Oil, Gas, and Geothermal Resources
801 K st., MS 18-05
Sacramento, CA 95814

916-445-9686

Location

Counties
Kern
Zip
93560
Total Acres
3110 sq mi
Parcel #
Multiple
State Highways
Hwy 99, 58, 43, 46, 119, 223, 20
Railways
Multiple
Airports
Multiple
Schools
Multiple
Waterways
Kern River
Other Location Info
Multiple

Notice of Determination

Approving Agency
DOGGR
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
801 K Street, MS 18-05, Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search