Revisions to Kern County Zoning Ordinance - 2015 (C), Focus on Oil and Gas Local Permitting - Area Energy Dehy2 to Cymric 12 & 20-Inch Pipeline Project (Streamb
4119 Documents in Project
Summary
SCH Number
2013081079
Lead Agency
Kern County
Document Title
Revisions to Kern County Zoning Ordinance - 2015 (C), Focus on Oil and Gas Local Permitting - Area Energy Dehy2 to Cymric 12 & 20-Inch Pipeline Project (Streamb
Document Type
NOD - Notice of Determination
Received
Posted
10/5/2017
Present Land Use
Developed and Undeveloped land in Kern County. Current Zoning Classifications and General Plan Map Code Designations to remain the same.
Document Description
CDFW has executed Streambed Alteration Agreement No. 1600-2017-0094-R4, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Aera Energy LLC.
Project includes activities related to the installation of pipe supports for new 12-inch and 20-inch above ground natural gas pipelines across two ephemeral streams. Gas lines will be placed on 13 new carbon steel T-supports anchored in concrete within both streams. Alternatively, pipes may be placed on cantilever supports installed by extending the top crossbar of an existing T-support by three feet in each direction with brace supports extending from the vertical support to underside of top crossbar or on pre-cast concrete block pipe supports placed directly on the ground. Installation of the supports will require the removal and trimming of approx. 8,520 sq. ft. of Valley saltbrush scrub habitat within the two streams.
Contact Information
Name
Sarah Bahm
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Counties
Kern
Zip
93560
Total Acres
3110 sq mi
Parcel #
Multiple
State Highways
Hwy 99, 58, 43, 46, 119, 223, 20
Railways
Multiple
Airports
Multiple
Schools
Multiple
Waterways
Kern River
Other Location Info
Multiple
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.