CRC 03063394

645 Documents in Project

Summary

SCH Number
2013081079
Lead Agency
Kern County
Document Title
CRC 03063394
Document Type
NOD - Notice of Determination
Received

Document Description
The originally approved project consists of an amendment to Title 19 Kern County Zoning Ordinance (July 2012) with focus on Chapter 19.98 (Oil and Gas Production), to include new site development standards for all oil and gas exploration, extraction, operations, and production activities in unincorporated Kern County. The Division of Oil, Gas, and Geothermal Resources, as the CEQA responsible agency, will be issuing a permit for the proposed project activity, which consists of the following: CRC proposes to drill, complete, and hydraulically fracture a new oil and gas well. Well will be drilled from a single well pad (the Section 14H Well Pad). The proposed well will be directionally drilled form the centralized Section 14H pad in order to minimize land disturbance and will target the Stevens Sands reservoir. The well will the be perforated and completed with a single stage hydraulic fracture in the Stevens Sands. *SEE NOD FOR FULL DETAILS Details on well location are online at: http://www.conservation.ca.gov/dog/pages/wellfinder.aspx

Contact Information
Meri Meraz
Department of Conservation
Division of Oil, Gas, and Geothermal Resources 801 K Street, MS 18-05
Sacramento, CA 95814

916.445.9686

Location

Coordinates
35.148528°'"N 119.261412°'"W
Counties
Kern
Township
32S
Range
25E
Section
14
Base
MDBM

Notice of Determination

Approving Agency
DOGGR
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
2700 M Street, Suite 100, Bakersfield, CA 93301

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search