UIC CRPC 53203007

4119 Documents in Project

Summary

SCH Number
2013081079
Lead Agency
Kern County
Document Title
UIC CRPC 53203007
Document Type
NOD - Notice of Determination
Received
Posted
10/11/2021
Document Description
The project activity is within the scope of Title 19, Chapter 19.98 of Kern County Zoning Code (Oil and Gas Production), which dictates site development standards for all oil and gas exploration, extraction, operations, and production activities in unincorporated Kern County. The Geologic Energy Management Division (CalGEM), as the CEQA responsible agency, will be issuing a permit for the proposed project activity, which consists of the following: California Resources Production Corporation (CRPC) proposed a waterflood project to provide pressure support and displacement for oil production from the Upper Stevens (Paloma sand) reservoir, and to gather data to aid in assessing and designing future waterflood potential. The implementation of this project is expected to provide the key variables and necessary data to design and optimize future waterflood development. The proposed project comprises re-entering a abandoned well # 36-35 and converting it to an injector. The proposed project is located approximately 21 miles southwest of the City of Bakersfield and is contained entirely within the Paloma oil field.

Contact Information

Name
Larry Kleinecke
Agency Name
California Department of Conservation
Contact Types
Responsible Agency

Location

Counties
Kern
Township
31S
Range
26E
Section
35
Base
MD B&M

Notice of Determination

Approving Agency
California Department of Conservation
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Kern
Final Environmental Document Available at
https://kernplanning.com/environmental-doc/oil-and-gas-sreir/

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print