Caleco UIC 464-00-0018

4119 Documents in Project

Summary

SCH Number
2013081079
Lead Agency
Kern County
Document Title
Caleco UIC 464-00-0018
Document Type
NOD - Notice of Determination
Received
Posted
9/30/2021
Document Description
The project activity is within the scope of Title 19, Chapter 19.98 of Kern County Zoning Code (Oil and Gas Production), which dictates site development standards for all oil and gas exploration, extraction, operations, and production activities in unincorporated Kern County. The Geologic Energy Management Division (CalGEM), as the CEQA responsible agency, will be issuing a permit for the proposed project activity, which consists of the following: Caleco LLC has applied for a permit for a new underground injection project to convert two idle wells, Wellington-Maricopa 2 (API 02935909) and Wellington-Maricopa 5 (02935912) into Class II water flood injection wells. The wells will reinject produced water back into the original zone of production. The conversion will stimulate production and contribute reservoir pressure that has been depleted over several decades of drawdown. No other wells will be drilled, plugged, or abandoned as part of this project.

Contact Information

Name
Larry Kleinecke
Agency Name
California Department of Conservation
Contact Types
Responsible Agency

Location

Counties
Kern
Township
11N
Range
23W
Section
08
Base
MD B&M

Notice of Determination

Approving Agency
California Department of Conservation
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Kern
Final Environmental Document Available at
https://kernplanning.com/environmental-doc/oil-and-gas-sreir/

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print