Aera-052-0006

4119 Documents in Project

Summary

SCH Number
2013081079
Lead Agency
Kern County
Document Title
Aera-052-0006
Document Type
NOD - Notice of Determination
Received
Posted
1/31/2017
Present Land Use
Developed and Undeveloped land in Kern County. Current Zoning Classifications and General Plan Map Code Designations to remain the same.
Document Description
The originally approved project consists of an amendment to Title 19 Kern County Zoning Ordinance (July 2012), with focus on Ch. 19.98 (Oil and Gas Production), to include new site development standards for all oil and gas exploration, extraction, operations, and production activities in unincorporated Kern County. DOGGR, as the Responsible Agency, will be issuing a permit for the proposed project activity, which consists of the following: Aera Energy LLC proposes to hydraulically fracture 2 wells which is expected to take 3 days, or less per well, including placement of portable tanks and all ancillary equipment to support the closed loop system, as well as the well stimulation treatments. The wells are in the densely developed South Belridge oilfield and drilling commenced in 2016.

Contact Information

Name
Jan Perez
Agency Name
Dept. of Conservation
Contact Types
Lead/Public Agency

Location

Counties
Kern
Zip
93560
Total Acres
3110 sq mi
Parcel #
Multiple
State Highways
Hwy 99, 58, 43, 46, 119, 223, 20
Railways
Multiple
Airports
Multiple
Schools
Multiple
Waterways
Kern River
Other Location Info
Multiple

Notice of Determination

Approving Agency
Division of Oil, Gas, and Geothermal Resources
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print