PLN21-00298

1699 Documents in Project

Summary

SCH Number
2013081079
Public Agency
Kern County
Document Title
PLN21-00298
Document Type
NOE - Notice of Exemption
Received
Posted
6/9/2021

Document Description
California High Speed Rail (CHSR) is constructing the phase 1 of the High-Speed Rail Passenger Service in the Central Valley. Based on our review of CRC’s internal engineering standards, as well as generally accepted industry practices, we have concluded that the minimum allowable distance from the proposed HSR line is 200 feet from CRC’s facilities. Therefore, the three storage tanks and associated auxiliary equipment within this 200-feet zone will need to be relocated. This scope includes the construction of a new tank battery (three, 3,000-barrel tanks) with the same capacity and design basis of the existing CRC Rose Facility located at Wasco, CA. Also, the relocation of the LACT Unit and associated vent stack, and truck loading facility is included. The major equipment included in the relocated facility are the following: • 2 new Oil Storage • 1 new Produced Water Tank • 1 Relocated LACT Unit Charge Pump • 1 Relocated LACT Unit • 1 relocated Vent Stack Truck Loading system • 1 Relocated Truck Loading Skid

Contact Information
Palmira Hernandez
California Resources Production Corporation
Project Applicant
900 Old River Road
Bakersfield, CA 93311

Phone : (661) 335-2664
palmira.hernandez@crc.com
Lorelei H. Oviatt
Kern County Planning Department
Lead/Public Agency
2700 M STREET, SUITE #100
BAKERSFIELD, CA 93301

Phone : (661) 862-8600
Loreleio@kerncounty.com

Location

Counties
Kern
Parcel #
059-280-578

Notice of Exemption

Exempt Status
Ministerial
Type, Section or Code
Sec. 21080(b)(1); 15268
Reasons for Exemption
O&G Minor Activity Review are ministerial under Kern County Zoning Ordinance and are exempt under Sections 21080(b)(1) and 15268 of the State CEQA Guidelines
County Clerk
Kern

Attachments

Notice of Exemption
Signed NOE PLN21-00298   PDF 82 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print