Aera 050-0003 (03051053)
4119 Documents in Project
Summary
SCH Number
2013081079
Lead Agency
Kern County
Document Title
Aera 050-0003 (03051053)
Document Type
NOD - Notice of Determination
Received
Posted
10/24/2018
Present Land Use
Developed and Undeveloped land in Kern County. Current Zoning Classifications and General Plan Map Code Designations to remain the same.
Document Description
The originally approved project consists of an amendment to Title 19 Kern County Zoning Ordinance with focu on Chapter 19.98 (Oil and Gas Production), to include new site development standards for all oil and gas exploration, extraction, operations, and production activities in unincorporated Kern County. The Division of Oil, Gas, and Geothermal Resources, as the CEQA responsible agency, will be issuing a permit for the proposed project activity, which consists of the following:
Aera Energy LLC (Aera) proposes to hydraulically fracture 1 well. The well is in a densely developed oilfield (North Belridge) and is scheduled to be drilled. Any ground disturbance or expansion of facilities associated with this project has been mitigated through the Kern County Oil and Gas ordinance.
Note: See NOD for full project description
Details on well location can be found on the Division's website at:
http://www.conservation.ca.gov/dog/pages/wellfinder.aspx
Contact Information
Name
Meri Meraz
Agency Name
Department of Conservation
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Kern
Township
27S
Range
20E
Section
35
Base
MDBM
Other Location Info
South Belridge
Other Information
API # 03051053; well name 548A6-35
Notice of Determination
Approving Agency
DOGGR
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.