Berry 03060409 (Supplement to WST Permit 18-0081)

4119 Documents in Project

Summary

SCH Number
2013081079
Public Agency
Kern County
Document Title
Berry 03060409 (Supplement to WST Permit 18-0081)
Document Type
NOE - Notice of Exemption
Received
Posted
8/13/2018
Document Description
The project consists of modifying the well stimulation design to an already approved and permitted hydraulic facture activity to well API# 03060409 in the South Belridge oilfield of Kern County. There is also an adjustment to the air sampling requirement for this well.

Contact Information

Name
Teresa Fung
Agency Name
Department of Conservation Division of Oil, Gas & Geothermal Res
Contact Types
Lead/Public Agency

Name
Agency Name
Berry Petroleum Company, LLC
Contact Types
Project Applicant

Location

Counties
Kern
Cross Streets
South Belridge
Township
28S
Range
21E
Section
19
Base
MDBM

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 1: Existing Facilities; General Exemption
Reasons for Exemption
The basis for the Division's determination that the project is exempt from the requirements of CEQA is provided in the brief explanation below. Class 1 - Existing Facility: The Division has determined that the project is categorically exempt from CEQA under the "Class 1" ( 14 CCR 15301) exemption because the activity is already permitted. No new surface disturbance will occur. General Exemption: The Division has determined that the project is categorically exempt from CEQA under the General or Common Sense (14 CCR 15061(b)(3)) exemption per the CEQA Guidelines because the adjustments in air sampling requirements for this well has no possibility of a significant effect on the environment. Exceptions to Exemptions: The otherwise-applicable categorical exemptions (PRC §21084; 14 CCR 15300.2(c)). There is no substantial evidence that there are any "unusual circumstances" associated with the proposed project that create a reasonable possibility that the activity will have a significant effect on the environment, and that there is no significant "cumulative impacts" resulting from successive projects of the same type in the same place. Therefore, this project is not subject to CEQA.
Download CSV New Search Print