Aera 052-0029

677 Documents in Project

Summary

SCH Number
2013081079
Lead Agency
Kern County
Document Title
Aera 052-0029
Document Type
NOD - Notice of Determination
Received

Document Description
The originally approved project consists of an amendment to Title 19 Kern County Zoning Ordinance (July 2012), with focus on Chapter 19.98 (Oil and Gas Production), to include new site development standards for all oil and gas exploration, extraction, operations, and production activities in unincorporated Kern County. The DOGGR, as the CEQA responsible agency, will be issuing a permit for the proposed project activity, which consists of the following: Aera Energy LLC (Aera) proposes to hydraulically fracture 14 wells. It will include placement of portable tanks and all ancillary equipment to support the closed loop system, as well as the well simulation treatments. The wells are in a densely developed oilfield (South Belridge) and are scheduled to be drilled. Fluids from the WST will be collected in a closed system and will not be discharged onto the ground or into sumps. Flow-back fluids from the wells immediately after WST operations will be collected in the closed system at the well site. The collected fluid will be transported from the well sites for treatment in Aera's water treatment facility.

Contact Information
Meri Meraz
DOGGR
801 K Street, MS 18-05
Sacramento, CA 95814

916-445-9686

Location

Counties
Kern
Zip
93560
Total Acres
3110 sq mi
Parcel #
Multiple
State Highways
Hwy 99, 58, 43, 46, 119, 223, 20
Railways
Multiple
Airports
Multiple
Schools
Multiple
Waterways
Kern River
Other Location Info
Tupman

Notice of Determination

Approving Agency
DOGGR
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
http://pcd.kerndsa.com/oil-gas-zoning-amendment

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search