Donner Summit PUD (formerly Big Bend MWC) Water Source Study
2 Documents in Project
Summary
SCH Number
2013078274
Public Agency
Donner Summit Public Utility District
Document Title
Donner Summit PUD (formerly Big Bend MWC) Water Source Study
Document Type
NOE - Notice of Exemption
Received
Posted
7/23/2013
Document Description
The drilling of a test well on USFS land. Purpose is to prospect for water that meets the Safe Drinking Water Standards and is of enough quantity to serve the small community of Big Bend. The beneficiaries of the project will be the small community of Big Bend water users who have been on a Boil Water Notice for over 10 years.
Contact Information
Name
Tom Skjelstad
Agency Name
Donner Summit Public Utility District
Contact Types
Lead/Public Agency
Phone
Location
Counties
Placer
Other Location Info
Big Bend
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15301(c), 02(c) and 03(d)
Reasons for Exemption
The project consists of repair and mainteance of an existing road (15301(c); replacement or reconstruction of existing structures where the new structure will be located on the same site, test well will be located at same site as existing well (15302(c); and construction and location of limited numbers of new, small facilities or structures (15303(d). The test well may replace the existing spring.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.