Operation of California Water Service Company (CWSC)- Salinas Hills - Station 70-01 Phase 2 - 0.15 MG Tank Project (Project)

3 Documents in Project

Summary

SCH Number
2013061030
Lead Agency
Monterey County
Document Title
Operation of California Water Service Company (CWSC)- Salinas Hills - Station 70-01 Phase 2 - 0.15 MG Tank Project (Project)
Document Type
NOD - Notice of Determination
Received
Posted
5/25/2018
Present Land Use
Water Storage / Low Density Residential, Site Plan Review, Design Control / Low Density Residential, 1 Acre per Unit
Document Description
CWSC-Salinas Hills proposed project will address water quality issues and provide a reliable water supply for emergency, operational, and fire flow needs for the users within the CWSC system area. This is a two-phase project and Phase 1 has been completed. The overall project included demolition of all existing facilities and equipment, and rebuilding of the water storage facility including construction of two above ground, welded steel water storage tanks, 150,000 and 170,000 gallons in size. Phase 2, the Project, includes destruction of the two existing groundwater wells, removal of six existing, 8,000-gallon plastic water storage tanks and pumping equipment, and construction of a 150,000 gallon bolted steel storage tank (44' diameter x 16' height) with a 3-foot-high concrete ring-wall foundation and associated piping. The construction area is 0.26 acres and will include planting of eight CA coast live oak trees (Quercus agrifolia) to replace trees of the same species that will be removed due to construction.

Contact Information

Name
Jan Sweigert
Agency Name
CA Department of Public Health Monterey District Office
Contact Types
Lead/Public Agency

Location

Cities
Salinas
Counties
Monterey
Cross Streets
Intersection of Mesa Road and Pine Canyon Road
Zip
93908
Total Acres
~1/4
Parcel #
415-031-003-000, -004-000
State Highways
No
Railways
No
Airports
No
Schools
No
Waterways
Salinas River

Notice of Determination

Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print