Frankline/Fernandez Trail (Lake or Streambed Alteration Agreement No. 1600-2014-0194-R3)

2 Documents in Project

Summary

SCH Number
2013052006
Lead Agency
Hercules, City of (City of Hercules)
Document Title
Frankline/Fernandez Trail (Lake or Streambed Alteration Agreement No. 1600-2014-0194-R3)
Document Type
NOD - Notice of Determination
Received

Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2014-0194-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Muir Heritage Land Trust. The Project is limited to the construction of eight pedestrian, clear-span, stream crossings associated with the installation of 3.25 miles of 4 foot wide, multi-use dirt trails connecting the Fernandez Ranch Open Space to the Franklin Ranch. All bridges/boardwalks will be four feet wide with abutments above top of bank for a clear-span at each crossing. The bridges will consist of 8x8 pressure treated beams placed on 8 inch deep by 16 inch wide bases of gravel and secured in place using 5-foot pieces of rebar as necessary. Each crossing will require excavation of a 1.5 foot wide, 4 foot long area for the abutments. When the distance to the bottom of the channel is greater than 30 inches wooden railing will be installed. All staging and personnel will enter and exit the Project area at the staging location off Christie Road in the Fernandez Ranch.

Contact Information
Robert Stanley
CDFW Bay Delta Region
7329 Silverado Trail
Napa, CA 94558

707-944-5573

Location

Cities
Hercules
Counties
Contra Costa
Cross Streets
SR 4 & Christie Road
Zip
94547
Parcel #
362-020-017, -019, -022
State Highways
SR 4
Railways
BNSF
Airports
No
Schools
Several
Waterways
Rodeo Creek, Refugio Creek

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
CDFW Bay Delta Region, 7329 Silverado Trail, Napa, CA 94558

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No