Gaviota Curve Realignment Project
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2013051062
- Lead Agency
- California Department of Transportation, District 5
- Document Title
- Gaviota Curve Realignment Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/16/2013
- Present Land Use
- Immediate area is zoned as transportation corridor, and will impact a portion of area zoned as recreation.
- Document Description
- Caltrans proposes a safety improvement project along Highway 101, from 0.7 mile north of Beckstead Overcrossing (PM 45.6) to 0.9 mile south of Gaviota Tunnel (PM 46.4) in Santa Barbara County near Gaviota. The project proposes to realign the existing northbound compound curve (two separate curve segments with decreasing radii) with a single radius curve. In addition, the project proposes to widen the existing shoulders along the 2 northbound lanes, modify the median barrier, culverts and vertical profile located on the northbound side of Hwy 101.
- Contact Information
-
Kelso Vidal
California Department of Transportation, District 5
Lead/Public Agency
50 Higuera Street
San Luis Obispo, CA 93401
Phone : (805) 542-4671
Location
- Coordinates
- 34°48'0"N 120°22'0"W
- Cities
- Goleta
- Counties
- Santa Barbara
- Cross Streets
- Highway 101 and Gaviota Beach Road
- Zip
- 93117
- Total Acres
- 452.22
- Parcel #
- 081-270-003
- State Highways
- Hwy 101
- Railways
- UPRR
- Waterways
- Gaviota Creek
- Other Location Info
- Gaviota
Notice of Determination
- Approving Agency
- Department of Transportation
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- http://www.dot.ca.gov/dist05/projects/
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.