Gaviota Curve Realignment Project

4 Documents in Project

Summary

SCH Number
2013051062
Lead Agency
California Department of Transportation, District 5
Document Title
Gaviota Curve Realignment Project
Document Type
NOD - Notice of Determination
Received
Posted
12/16/2013
Present Land Use
Immediate area is zoned as transportation corridor, and will impact a portion of area zoned as recreation.
Document Description
Caltrans proposes a safety improvement project along Highway 101, from 0.7 mile north of Beckstead Overcrossing (PM 45.6) to 0.9 mile south of Gaviota Tunnel (PM 46.4) in Santa Barbara County near Gaviota. The project proposes to realign the existing northbound compound curve (two separate curve segments with decreasing radii) with a single radius curve. In addition, the project proposes to widen the existing shoulders along the 2 northbound lanes, modify the median barrier, culverts and vertical profile located on the northbound side of Hwy 101.

Contact Information

Name
Kelso Vidal
Agency Name
California Department of Transportation, District 5
Contact Types
Lead/Public Agency

Location

Cities
Goleta
Counties
Santa Barbara
Cross Streets
Highway 101 and Gaviota Beach Road
Zip
93117
Total Acres
452.22
Parcel #
081-270-003
State Highways
Hwy 101
Railways
UPRR
Waterways
Gaviota Creek
Other Location Info
Gaviota

Notice of Determination

Approving Agency
Department of Transportation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print