Fresno Canyon Flood Mitigation Project

5 Documents in Project

Summary

SCH Number
2013031072
Lead Agency
Ventura County Watershed Protection District
Document Title
Fresno Canyon Flood Mitigation Project
Document Type
NOD - Notice of Determination
Received
Posted
5/13/2014
Present Land Use
Flood Control facilities
Document Description
The Ventura County Watershed Protection District is proposing to construct a new bypass storm drain facility to transport floodwaters, sediment, and debris from Fresno Canyon to the Ventura River. The purpose of the project is to reduce the risk of flooding in the community of Casitas Springs and potential flooding closures of SR 33. The facility will be designed to convey the fully bulked flows resulting from the 100-year flood event. A new inlet structure with emergency spillway and rock riprap protection would be constructed in Fresno Canyon upstream (east) of SR 33. A 12-foot diameter reinforced concrete conveyance pipe (total length approximately 975 feet long) would be installed via horizontal boring beneath SR 33 and then via open trench method for the remaining approximately 395 linear feet to the Ventura River. An outlet facility would be constructed in the Ventura River with tie-in to adjacent high ground on the north and south, a cut-off wall along the west edge, and a cut-off wall at the downstream edge of the south tie-in, all consisting of ungrouted 1-ton rock riprap.

Contact Information

Name
Tully Clifford
Agency Name
Ventura County Watershed Protection District
Contact Types
Lead/Public Agency

Location

Counties
Ventura
Cross Streets
SR 33 / Sycamore Drive
Zip
93001
Parcel #
multiple
State Highways
Hwy 33
Waterways
Ventura River
Other Location Info
Casitas Springs

Notice of Determination

Approving Agency
Ventura County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes