I-110 High Occupancy Toll Lane Flyover Project

9 Documents in Project

Summary

SCH Number
2013021002
Lead Agency
California Department of Transportation, District 7
Document Title
I-110 High Occupancy Toll Lane Flyover Project
Document Type
NOD - Notice of Determination
Received
Posted
4/27/2018
Present Land Use
Commercial, industrial, open space, and residential multiple family land use designations
Document Description
Note: Per Lead Agency, NOD Rescinded - Refer to NOD posted on 7/5/2018 Caltrans in cooperation with Metro proposes to construct an elevated off-ramp structure on the Northbound (NB) Interstate 110 (I-110) between 30th Street and Figueroa Street Over-crossing (OC) in the City of Los Angeles. The proposed structure would bypass the bottlenecks intersections at Flower Street and Adams Blvd. and NB I-110 High Occupancy Toll (HOT) off-ramp to Adam Blvd., connecting the HOT lane traffic to Figueroa Street.

Contact Information

Name
Jason Roach
Agency Name
California Department of Transportation, District 7
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Northbound I-110 between 30th Street and Figueroa Street Over-crossing
Zip
90007

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print