Lone Valley Solar Park (Streambed Alteration Agreement 1600-2013-0148-R6)

3 Documents in Project

Summary

SCH Number
2012121078
Lead Agency
San Bernardino County
Document Title
Lone Valley Solar Park (Streambed Alteration Agreement 1600-2013-0148-R6)
Document Type
NOD - Notice of Determination
Received
Posted
1/28/2014
Present Land Use
Vacant
Document Description
CDFW is issuing a Streambed Alteration Agreement for the construction and operation of a 10 megawatt (MW) alternating current photovoltaic module (PV) on approximately 65 acres of the 79.9-acre site. The Project authorized under this Agreement includes the construction of three detention basins to manage the increase in runoff volume during large storm events. The site contains portions of 12 ephemeral washes the total 9.15 acres. Nine of 12 smaller drainages would be filled and flows redirected to larger more complex channels that would be preserved in their natural state; approximately 100,000 cubic yards of cut/fill would be balanced on-site. The new channel will require routine maintenance activities, which may include the repair or replacement of rip rap, clearing of vegetation and siltation, grading, or excavation and any severe damage caused by flooding, natural disaster, or a catastrophic event. The Project will be mitigated with an onsite conservation easement.

Contact Information

Name
Heather Weiche
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Location

Counties
San Bernardino
Cross Streets
Camp Rock Road and Arroyo Road
Zip
92356
Total Acres
79.9
Parcel #
0449-172-75, 0449-631-02
State Highways
Hwy 18
Railways
No
Airports
No
Schools
No
Waterways
No
Township
4N
Range
1E
Section
34
Base
SBB&M
Other Location Info
Lucerne Valley

Notice of Determination

Approving Agency
Deparrtment of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes