Addendum to the Negative Declaration of the Plume 3 Groundwater Corrective Measures Project, DuPoint Oakley Site; U.S. EPA ID. NO. CAD. 009 151 671

3 Documents in Project

Summary

SCH Number
2012102052
Lead Agency
California Department of Toxic Substances Control (DTSC)
Document Title
Addendum to the Negative Declaration of the Plume 3 Groundwater Corrective Measures Project, DuPoint Oakley Site; U.S. EPA ID. NO. CAD. 009 151 671
Document Type
NOD - Notice of Determination
Received
Posted
6/11/2014
Present Land Use
Currently vacant/zoned heavy industrial/planned conversion to light industrial
Document Description
The project is located at the Dupont Oakley Site, 6000 Bridgehead Road, in the town of Oakley. The project consists of constructing three types of wells as part of an in-situ groundwater remediation project at the inactive manufacturing site. The project will permanently and temporarily impact waters of the United States.

Contact Information

Name
Marissa Van Dyke
Agency Name
Central Valley Regional Water Quality Control Board
Contact Types
Lead/Public Agency

Location

Cities
Oakley
Counties
Contra Costa
Cross Streets
Wilbur Avenue
Zip
94561
Total Acres
378
Parcel #
037020016
State Highways
Hwy 160,4
Railways
Burlington Northern Santa Fe
Waterways
San Joaquin River
Township
2N
Range
2E
Section
22
Base
MDB&M

Notice of Determination

Approving Agency
Central Valley RWQCB
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print