Twin Cities Road Widening Project (Revised to include nighttime construction work)

4 Documents in Project

Summary

SCH Number
2012102040
Lead Agency
City of Galt
Document Title
Twin Cities Road Widening Project (Revised to include nighttime construction work)
Document Type
NOD - Notice of Determination
Received
Posted
6/24/2013
Present Land Use
Various
Document Description
The proposed project was originally approved on August 3, 2011 and consists of adding a westbound lane on Twin Cities Road from east of Fermoy Way to Bergeron Road resulting in two lanes in both the eastbound and westbound direction, as well as modifying the Twin Cities/Fermoy Way intersection, approaches and transitions. The ~length of improvements, including turn pockets and tapers, is 1,800 feet. The existing drainage ditches along the northern boundary of the improvement area could be relocated and/or modified to be piped underground. A short row of trees existing along the northeastern border of the improvement area, which may be removed with implementation of the proposed project. The project was subsequently modified to include ~one week of nighttime construction which was not contemplated in the original project description and adopted IS/MND. Consequently, a CEQA Addendum was prepared in accordance with CEQA Guidelines Section 15164 to address the potential noise impacts of one week of nighttime construction. Additional mitigation was also adopted.

Contact Information

Name
Chris Erias
Agency Name
City of Galt
Contact Types
Lead/Public Agency

Location

Cities
Galt
Counties
Sacramento
Cross Streets
Twin Cities Road from east of Fermoy Way to Bergeron Road
Zip
95632
Total Acres
4.8
State Highways
SR 99
Railways
UPRR
Schools
Various
Waterways
Laguna Creek, Deadman Gulch
Township
5N
Range
6E
Section
10
Base
MDB&M

Notice of Determination

Approving Agency
City of Galt City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print