Lake or Streambed Alteration Agreement No. 1600-2012-0114-R1 for Timber Harvesting plan 1-07-078 MEN, "The Gate"

2 Documents in Project

Summary

SCH Number
2012099002
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Lake or Streambed Alteration Agreement No. 1600-2012-0114-R1 for Timber Harvesting plan 1-07-078 MEN, "The Gate"
Document Type
NOD - Notice of Determination
Received
Posted
12/20/2012
Document Description
The California Department of Fish and Game is executing Lake and Streambed Alteration Agreement Number 1600-2012-0285-3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, the East Bay Regional Park District. The project is located along a trail that begins on Dutra Road, off of Franklin Canyon Road, and ends at Ferndale Road, off of Alhambra Road, southwest of Martinez in unincorporated Contra Costa County. The project is limited to drainage improvements associated with conversion of an existing firer road to multi-use hiking trail, including replacement of an existing 24-inch culvert with a new 36-inch culvert (with no net increase in culvert length), installation of a 30-foot long, 24-inch culvert with headwall/tailwall and basin, and riparian tree trimming to allow equipment clearance for erosion repair.

Contact Information

Name
Randi Adair
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Willits
Counties
Mendocino

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print