Sausalito Ferry Terminal Vessel Boarding Rehabilitation Project

3 Documents in Project

Summary

SCH Number
2012092037
Lead Agency
Golden Gate Bridge Highway and Transportation District
Document Title
Sausalito Ferry Terminal Vessel Boarding Rehabilitation Project
Document Type
NOD - Notice of Determination
Received

Document Description
The Golden Gate Bridge, Highway and Transportation District proposes to replace the existing passenger boarding system with a new boarding system. The replacement passenger boarding system will be located in approx. the same location as the existing and will include a new 145.5 feet long x 53 feet wide concrete float, a new 90 feet long x 16 feet wide steel gangway and a new 21 feet wide pile-supported concrete pier with 5 feet wide x 36 feet long bump-outs. The Modified Project also includes the construction of temporary facilities to maintain current ferry service during the demolition of the existing boarding system and the construction of the new boarding system. The temporary facilities will be located immediately adjacent to and south of the existing boarding system. The gangway and float of the existing boarding system will be used for the temporary facilities, with access provided by a temporary 8 feet wide access pier.

Contact Information
John R. Eberle
Golden Gate Bridge Highway and Transporation District
Presidio Station P.O. Box 9000
San Francisco, CA 94129-0601

(415) 923-2003

Location

Coordinates
37°51'22"N 122°28'39"W
Cities
Sausalito
Counties
Marin
Cross Streets
Bridgeway Avenue and Anchor Street
Zip
94965
Total Acres
0.313
Parcel #
065-073-05
State Highways
Hwy 101
Railways
N/A
Airports
N/A
Schools
Sausalito Nursery School
Waterways
San Francisco Bay

Notice of Determination

Approving Agency
Golden Gate Bridge, Highway & Transportation District
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Golden Gate Bridge Toll Plaza, SF, CA

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search