North Lane Stormwater Mitigation Project (Lake or Streambed Alteration Agreement No. 1600-2012-0168-R3)

3 Documents in Project

Summary

SCH Number
2012082004
Lead Agency
Orinda, City of (City of Orinda)
Document Title
North Lane Stormwater Mitigation Project (Lake or Streambed Alteration Agreement No. 1600-2012-0168-R3)
Document Type
NOD - Notice of Determination
Received

Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2012-0168-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, City of Orinda as represented by Larence Theis. The Project is limited to the construction of a flood flow bypass culvert consisting of a new upstream headwall, 60 inch - 1,300 foot long underground culvert and a new headwall at the outlet of San Pablo Creek. The existing channel will remain in place. The new culvert will be pre-cast concrete installed by open trenching on the upper 900 foot segment and jack and bore on the lower 310 foot segment. The trench will be cut in the roadway of North Lane and will be a minimum of 8 feet wide and 5.3 feet deep. Following installation the trench will be backfilled and paved. An outfall structure will be paved at the mouth of San Pablo Creek using a reinforced concrete apron, cutoff wall and straight wingwalls. A 20 x 21 foot area of rock slope protection will be placed around the outfall.

Contact Information
Robert Stanley
CDFW Bay Delta Region
7329 Silverado Trail
Napa, CA 94558

707-944-5573

Location

Coordinates
37°53'30"N 122°11'58"W
Cities
Orinda
Counties
Contra Costa
Cross Streets
Camino Pablo, North Lane, Ardilla Road
Zip
94563
Total Acres
.6
Parcel #
263110004, 264130019
State Highways
Hwy 24
Schools
Wagner Ranch ES
Waterways
San Pablo Creek
Township
1N
Range
3W
Base
MDB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
CDFW Bay Delta Region, 7329 Silverado Trail, Napa, CA 94558

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No