Agreement Between the Department of Water Resources of the State of California and Antelope Valley-East Kern Water Agency for Modification, Operation and Mainte

4 Documents in Project

Summary

SCH Number
2012081073
Lead Agency
Antelope Valley-East Kern Water Agency (AVEK)
Document Title
Agreement Between the Department of Water Resources of the State of California and Antelope Valley-East Kern Water Agency for Modification, Operation and Mainte
Document Type
NOD - Notice of Determination
Received
Posted
12/24/2014
Present Land Use
LU: Undeveloped Z: O-S, A-2-1 GPD: Non-Urban
Document Description
The existing 96th Street East Turnout consists of 20-inch diameter coal-tar lined and coated steel pipe with a priming station to siphon the water out of the California Aqueduct, as well as a pump station, metering vault, and water filter bank. In order to supply water to and from AVEKWA's proposed Eastside Water Banking and Blending Project, AVEKWA must modify the existing 96th Street East Turnout for pumping surplus SWP water into recharge basins for later extraction as a supplemental supply to the Eastside WTP. AVEKWA will install approximately 360 feet of 20-inch cement-mortar lined and coated steel pipeline that ties into the existing 96th Street East Turnout's discharge pipeline just upstream of the pump station and runs westerly along DWR's right of way to a valve located adjacent to 96th Street East. AVEKWA will also install other equipment such as a metering vault, a magnetic flow meter, and associated electrical and instrumentation equipment to allow for the delivery of SWP water to and from the recharge basins. The maximum design capacity of the 96th Street East Turnout will remain unchanged at 11 cubic-feet-per-second.

Contact Information

Name
Craig Trombly
Agency Name
Department of Water Resources
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles
Cross Streets
116th Street East and East Avenue U
Zip
93553
Total Acres
80
Parcel #
3039-029-908, 3039-029-027
State Highways
SR 138
Railways
No
Airports
No
Schools
No
Waterways
CA Aqueduct
Township
5N
Range
10W
Section
15/16
Base
SBB&M
Other Location Info
City/Nearest Community: Pearblossom

Notice of Determination

Approving Agency
DWR
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print