Carmel River Reroute and San Clemente Dam Removal Project (Project), Lake and Streambed Alteration Agreement No. 1600-2013-0063-R4, Amendment No. 2

11 Documents in Project

Summary

SCH Number
2012071036
Lead Agency
California State Coastal Conservancy (SCC)
Document Title
Carmel River Reroute and San Clemente Dam Removal Project (Project), Lake and Streambed Alteration Agreement No. 1600-2013-0063-R4, Amendment No. 2
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2014
Present Land Use
Conservation, permanent grazing, mountain
Document Description
The California Department of Fish and Wildlife is issuing Amendment No. 2 to Lake and Streambed Alteration Agreement 1600-2012-0063-R4 to the Permittee, California Dam on the Carmel River in Monterey County. The Carmel River upstream of the existing San Clemente Dam will be rerouting trough a new, created channel. Amendment No. 2 includes changing the description of the access road bridge over Tularcitos Creek as a result of a change in design that includes a longer span; providing an alternative description of the temporary crossing over Tularcitos Creek used during permanent bridge construction; modifying the approval process for biologist to hand and relocate species of special concern; and allowing for excavation activity at night beyond what is authorized in the Agreement.

Contact Information

Name
Linda Connolly
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Location

Counties
Monterey
Cross Streets
San Clemente Drive
Zip
93940
Total Acres
0.6
State Highways
Carmel Valley Road
Waterways
Carmel River
Township
17S
Range
2E
Section
24
Base
MD B&M
Other Location Info
Carmel Valley Village

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print