Mira Sorrento Substation Project

2 Documents in Project

Summary

SCH Number
2012061036
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
Mira Sorrento Substation Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Undeveloped Land / Residential and Industrial/Industrial Employment
Document Description
The proposed project is located in the Sorrento Mesa area within the community of Mira Mesa in the City of San Diego, CA. The proposed 1.4-acre Mira Sorrento Substation would be situated on a 3.7-acre parcel and located approximately 600 feet northeast of I-805 and approximately 800 feet from the nearest residences. The new 120-megavolt ampere (MVA), 69-/12-kilovolt (kV) distribution substation would be constructed and operated by San Diego Gas & Electric (SDG&E) to meet existing and anticipated customer-driven electrical load growth and to improve distribution equipment reliability in the Sorrento Mesa area. Power to the substation facility will be supplied by an existing SDG&E 69 kV transmission line (TL665) that will require installation of underground transmission facilities off the substation site. Initially, six 12 kV underground distribution circuits will be installed and routed to Mira Sorrento Place to tie into the existing underground system serving the area. At full buildout, the substation is planned to have 120 MVA capacity with four 30 MVA transformer banks; four 69 kV lines; sixteen 12 kV circuits; four 12 kV capacitors and four bays of standard steel rack, approximately 30 feet tall, of 69 kV bus and 69 kV transformer; and one 40 foot-long x 20-foot-wide masonry block control shelter. In addition, on the northeast side of the substation site, two tiered retaining walls would be constructed that would be approximately 32 and 20 feet in height. Access to the substation facility will be via two 30-foot-wide driveways from Mira Sorrento Place to the west of the substation.

Contact Information

Name
Michael Rosauer
Agency Name
California Public Utilities Commission, Energy Division
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Vista Sorrento Parkway, Mira Mesa Boulevard
Zip
92121
Total Acres
3.7
Parcel #
340-090-65, 340-090-67, 304-090-64
State Highways
I-805, 5
Railways
Burlington Northern Santa Fe
Airports
Marine Corps Air Station
Schools
Audeo Charter School
Waterways
Los Penasquitos Creek
Township
15S
Range
3W
Section
5

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Airport/Energy Projects, California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Energy Commission, California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), Caltrans, Division of Aeronautics, Department of Water Resources, Office of Historic Preservation, Resources Agency, California Department of Transportation, District 11 (DOT)
State Reviewing Agency Comments
California Department of Transportation, District 11 (DOT)
Development Types
Other (Electrical Substation)
Local Actions
Electrical Substation
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Cultural Resources, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print