Linda Vista East Sewer Upsize and Realignment
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2012031062
- Lead Agency
- Vallecitos Water District
- Document Title
- Linda Vista East Sewer Upsize and Realignment
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/15/2012
- Document Description
- The upsizing and replacement of an existing underground gravity sewer line that runs through public streets and private properties, under State Hwy. 78 to an upstream connection with an existing sewer line in Blingham Drive. the project includes the underground installation of approximately 2,980 feet of new, gravity-drive n 15-inch diameter PVC sewer pipe including surface access manholes for maintenance and clean-out.
- Contact Information
-
Robert Scholl
Vallecitos Water District
Lead/Public Agency
201 Vallecitos De Oro
San Marcos, CA 92069
Phone : (760) 744-0460
Location
- Coordinates
- 33°8'18.3"N 117°11'21.7"W
- Cities
- San Marcos
- Counties
- San Diego
- Cross Streets
- Linda Vista Drive and Via Vera Cruz
- Zip
- 92069
- Parcel #
- 219-152-71 and City of San Marcos public rights-of-way
- State Highways
- SR 78
- Railways
- SDNR
- Airports
- No
- Schools
- Country Private, North Region Community, Discovery Schools
- Waterways
- San Marcos Creek, Lake San Marcos
Notice of Determination
- Approving Agency
- Vallecitos Water District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 201 Vallecitos De Oro, San Marcos, CA 92069
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.