Stieler Vesting Tentative Subdivision Map T08-030(2) and Zone Change RZ08-015

2 Documents in Project

Summary

SCH Number
2011122057
Lead Agency
Tuolumne County
Document Title
Stieler Vesting Tentative Subdivision Map T08-030(2) and Zone Change RZ08-015
Document Type
NOD - Notice of Determination
Received
Posted
4/18/2012
Present Land Use
The present zoning on the 22.4 acre project site is 22.1 acres of A-10 and 0.3 acres of R-1
Document Description
1. Vesting Tentative Subdivision Map T08-030(2) to create a subdivision by dividing a 22.4 parcel into 9 lots which will range in size from 2.0 gross acres to 3.3 gross acres. 2. Ordinance for Zone Change RZ08-015 to rezone the 22.4 acre project site to 14.5 acres of RE-2:D, and 7.9 acres of OS. 3. Resolution of application to the Local Agency Formation Commission (LAFCO) to form a County Service Area (CSA) to provide road maintenance for roads serving the proposed subdivision which are not accepted into the County Maintained System and maintenance of drainage improvements.

Contact Information

Name
Darlene Mae Stieler
Agency Name
Tuolumne County Community Resources Agency
Contact Types
Lead/Public Agency

Location

Counties
Tuolumne
Cross Streets
Apple Colony Road and Mount Eaton Road
Zip
95379
Total Acres
22.4
Parcel #
62-090-43 and 62-110-13
Railways
Sierra Railroad
Schools
Summerville ES
Waterways
North Fork Tuolumne River, Turnback and Duckwall Creeks
Township
1N
Range
16E
Section
8
Base
MDB&M
Other Location Info
City/Nearest Community: Tuolumne

Notice of Determination

Approving Agency
The Board of Supervisor for the County of Tuolumne
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print