PG&E Pittsburg-Tesla Reconductoring Project

6 Documents in Project

Summary

SCH Number
2011102034
Lead Agency
State Water Resources Control Board
Document Title
PG&E Pittsburg-Tesla Reconductoring Project
Document Type
NOD - Notice of Determination
Received
Posted
11/9/2012
Present Land Use
Industrial, Residential, Open Space, Grazing/Range, Windfarm
Document Description
In order to maintain service reliability and meet increasing electric load demands in the City of Pittsburg and surrounding areas in Contra Costa and Alameda counties, PG&E proposes to replace approximately 31 miles of 230 kilovolt transmission line between Pittsburg and Tesla Substations. This project will minimize the potential for future power demand overloads, and ensure service reliability to the East San Francisco Bay area. As part of this project, PG&E proposes to modify approximately 43 of 147 existing steel lattice towers. Of the 43 towers to be modified, four towers will receive dead end conversions, and 39 towers will receive approximately 16.5-foot cage extensions. All modifications are above ground and no foundation improvements will be required. The work performed at the towers will be conducted by helicopter. Ground access will take place at 12 areas along the existing rights of way. The project is scheduled for 19 months between September 2012 and May 2014. (This notice also submitted to State Clearinghouse on 10/18/2012 and to Alameda County.)

Contact Information

Name
Cliff Harvey
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Byron, Pittsburg, Tracy
Counties
Alameda, Contra Costa
Cross Streets
Willow Pass Rd., Leland Rd., Deer Valley Rd., Camino Diablo, Altamont Pass Rd., Midway
Zip
94565
Total Acres
32.456
Parcel #
numerous
State Highways
SR-4, I-580
Railways
Yes
Airports
Byron
Schools
Pittsburg USD
Waterways
San Joaquin River, Marsh Creek and Res, Bethany Res.
Base
MDB&M

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes