PG&E Pittsburg-Tesla Reconductoring Project

6 Documents in Project

Summary

SCH Number
2011102034
Lead Agency
State Water Resources Control Board
Document Title
PG&E Pittsburg-Tesla Reconductoring Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Various
Document Description
Note: Review Per Lead PG&E proposes to replace approximately 31 miles of 230 kilovolt transmission line conductors between Pittsburg and Tesla Substations to minimize potential future power demand overloads and ensure service reliability to the East San Francisco Bay Area. As part of this project, PG&E proposes to modify approximately 43 of 147 existing steel lattice towers. Work at the towers will be conducted by helicopter. Ground access to replace wire will take place at twelve areas along the existing right-of-way. The project is located within or alongside areas with land uses which include industrial, residential, agricultural, recreational, and natural resource protection. The project is scheduled to begin construction in March 2012, with an estimated duration of approximately 19 months, completing in October 2013.

Contact Information

Name
Cliff Harvey
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Byron, Pittsburg, Tracy
Counties
Alameda, Contra Costa
Cross Streets
31 mile long linear project
Parcel #
numerous
Other Location Info
City/Nearest Community: Midway

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Parks and Recreation, California Department of Transportation, District 4 (DOT), California Energy Commission, California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), Delta Stewardship Council, Department of Toxic Substances Control, Resources Agency, Department of Water Resources, California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW)
State Reviewing Agency Comments
Department of Water Resources, California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW)
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, GHG

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print