Palmdale Hybrid Power Plant

3 Documents in Project

Summary

SCH Number
2011089005
Lead Agency
California Energy Commission
Document Title
Palmdale Hybrid Power Plant
Document Type
NOD - Notice of Determination
Received
Posted
8/16/2011
Document Description
Note: Certified Regulatory Program The Palmdale Hybrid Power Plant will be a hybrid of natural gas-fired combined cycle generating equipment integrated with solar thermal generating equipment with a nominal electrical output of 570 megawatts (MW) and designed to provide base and peack load power services.

Contact Information

Name
Felicia Miller
Agency Name
California Energy Commission
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles

Notice of Determination

Approving Agency
California Energy Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.