Stream Alteration Agreement No. 1600-2011-0056-R4 for the Bob Jones Bike Trail Bridge Project, San Luis Obispo River

2 Documents in Project

Summary

SCH Number
2011089003
Lead Agency
City of San Luis Obispo
Document Title
Stream Alteration Agreement No. 1600-2011-0056-R4 for the Bob Jones Bike Trail Bridge Project, San Luis Obispo River
Document Type
NOD - Notice of Determination
Received
Posted
10/5/2012
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code for the Bob Jones Bike Trail Bridge Project. The Project is the construction of 800 feet of Class l bike and pedestrian trail (12 feet wide with 2-foot shoulders on each side) that includes installation of a 130-foot long, 10 feet wide, and single-span steel truss prefabricated bridge with Portland cement concrete deck to span over Prefumo Creek. It will be supported on concrete abutments located on top of ban and constructed on driven steel pile foundations. To install the abutments and approaches, 18 Pacific Willows over 4-inches diameter and two (2) Arroyo willows over 4-inches diameter will be removed and mitigated for with plantings. All work will occur outside of the wetted channel and no water will be diverted or drafted at the site during the course of construction. Equipment used will include a backhoe, bar bender, clam shovel, compactor, compressor, concrete mixer truck, concrete pump truck, crane, flatbed truck, generator, impact pile drive, pavement scarifier, paver, pickup truck, pneumatic tools, roller, scraper, and welder/torch. The California Department of Fish and Game ("CDFG") has determined the Project is subject to regulation pursuant to Fish and Game Code Section 1600 et seq.

Contact Information

Name
Robb Tibstra
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
San Luis Obispo

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.