Clean Water State Revolving Fund (CWSRF) No. C-06-7867-110
3 Documents in Project
Summary
SCH Number
2011081037
Lead Agency
Orange County Water District
Document Title
Clean Water State Revolving Fund (CWSRF) No. C-06-7867-110
Document Type
NOD - Notice of Determination
Received
Posted
10/22/2013
Present Land Use
Open Space/Industrial
Document Description
Proposed project involves the construction and operation of a 4.5 acre basin that would be used for flood control protection and groundwater retention basin. The Basin will be excavated to a depth of 15 feet below the ground surface at a 2:1 slope and will then be over-excavated to a depth of 30 feet below the ground surface at a 1:1 slope. The over excavated area will be backfilled with sand to maintain slope stability. The Basin configuration will provide 0.96 acres of percolation area. The Basin will allow total 43.5 acre feet of storage with 1 foot of freeboard. A submersible sump pump will be constructed at the north western end of the Basin to drain the basin when cleaning.
Excess flood water from the Riverview Basin will be sent to the Basin by a 12-inch water supply pipeline. The pipeline will be jack and bored underneath the Channel. The pipeline will then extend along an existing service road located on Riverview Basin sand and gravel property and along Batavia Street and Fletcher Avenue to the Basin.
Contact Information
Name
Cedric Irving
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Location
Cities
Orange
Counties
Orange
Cross Streets
Fletcher Avenue/Batavia Street
Parcel #
374-632 03
State Highways
SR 57
Railways
No
Airports
John Wayne Airport
Waterways
Santa Ana River
Township
4
Range
9,10
Section
13
Notice of Determination
Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes